Where the money goes

Every figure on this page comes from the same ledger the finance team works in. There are no separate marketing numbers, and nothing here is rounded in our favour.

The ledger balances
Received equals allocated plus unallocated, and allocated equals reconciled plus money still in field hands. Both identities hold.
$1.072.400
Received
$806.500
Allocated to campaigns
$265.900
Not yet allocated

Money that has arrived but is not yet committed to a campaign. Disclosing it is the point: an appeal that reports only what it has spent is hiding its float.

$612.300
Reconciled with receipts
$194.200
In field hands

Released to teams and partners but not yet matched to receipts. Some of this is money in a boat on the Atrato right now.

14
Receipt sets outstanding

Figures as at 26 Ağu 2026 · 9.318 donors · 41 countries

Overhead

Administration and fundraising as a share of total expenditure. The board sets a ceiling, not a budget — under it is better.

%9,7
Current
%12
Board target
%15
Ceiling
$31.400
Payment fees, absorbed from reserves rather than deducted from gifts
History · Board, February 2026 · Quarterly, next 30 September 2026
2024 actual%12,8Above target; audit flagged fundraising staff costs
2025 actual%11,4Back under the 12% ceiling
2026 to date%10,2All appeals, organisation-wide

What the money bought

Every spend line, the team that made it, and the impact it is reported to have had. Lines still in review are marked as such rather than left out.

RefCategoryTeamImpactAmountReceipts
S-3391Water truckingRenacer WASH — Quibdó2.4M litres delivered to 11 communities$96.400Complete
S-3390Purification suppliesFundación Atrato Vivo5,460 family-months of purification supplies$68.200Complete
S-3389Plant repairRenacer WASH — QuibdóQuibdó plant back to 60% output$77.000Complete
S-3388Shelter kitsRenacer Shelter — Armenia4,860 kits to 4,860 households$171.5003 outstanding
S-3387Rent grantsCorporación Quindío Solidario712 households housed for 3 months$64.8005 outstanding
S-3386Structural assessmentsCruz Roja Risaralda1,940 homes assessed and tagged$52.400Complete
S-3385Engineering surveysRenacer Recovery — Pereira31 schools surveyed, 4 retrofits started$51.000Complete
S-3384Local contractingRenacer Recovery — Pereira9 local builders under contract$31.000Complete
S-3383Clinic runsRenacer Health — mobile clinics6,300 consultations in 14 municipalities$82.0006 outstanding

Trace a gift

Gifts carry a reference printed on the receipt. Enter one to see the campaign it funded and the spend lines that campaign paid for. No account needed — accountability behind a login is accountability a journalist cannot check.

What we got wrong

Mistakes are published here rather than corrected quietly. An appeal that has never made one is not being audited closely enough.

22 August 2026

A pump was bought twice

Two teams ordered a replacement pump for the Quibdó plant in the same week. USD 4,200 was spent twice. The second pump has been redeployed to Bahía Solano rather than returned, and request R-1035 is under query while the approval path is corrected.

19 August 2026

Shelter kit numbers were overstated for two days

A field tally counted kits dispatched rather than kits delivered, putting the public figure about 340 too high between 17 and 19 August. The figure now counts delivery signatures only.